Using the LPR also kept the ammonia charge to a minimum; far less than would be required for a traditional flooded evaporator.
A suction to liquid heat exchanger should be incorporated and is required on high back pressure flooded evaporator plant to reach the correct compressor operating temperatures.
The Brine itself or Secondary Refrigerant is circulated round the chambers via the brine pump that draws from the flooded evaporator and discharges into a manifold.
The compressor will shut-down on: Low gas pressure High temperature Low oil pressure Brine System The Brine System has a simple refrigeration cycle serving a single flooded evaporator.
R-407A was developed as a close match to R-22's capacities and flow rates, making it well suited as an energy efficient retrofit for R-22 in medium and low temperature refrigeration systems for supermarket and food storage applications, but not for air conditioning systems or those with flooded evaporators.