Additional examples are adjusted to the entries in an automated way - we cannot guarantee that they are correct.
The remaining tracks were removed in 2008 along with the overhead line equipment.
The derailment also brought down the overhead line equipment which had to be replaced.
This line closed in January 1966 and the overhead line equipment was removed.
The overhead line equipment depends on the location.
This allowed much of the outer London overhead line equipment to be replaced by modern, self-tensioning lines.
The overhead line equipment had to be replaced, double-line catenary from a single stand being used.
Overhead line equipment can be adversely affected by strong winds, thus bringing the wires down and stopping all trains.
British Insulated Cables supplied the overhead line equipment.
Overhead line equipment installation may require reconstruction of bridge structures to provide a safe clearance electrical clearance.
Two factory train for renewing overhead line equipment on the West Coast Mainline was ordered in 1999, and delivered in 2000.
The line is single track and is electrified at 25 kV AC using overhead line equipment.
During the remainder of January, tunnel equipment was repaired and replaced as necessary, with the installation of overhead line equipment on 28 January.
The extension of the overhead line equipment soon allowed the units to work services on the West Anglia route from London Liverpool Street to Cambridge.
Overhead line equipment (OLE or OHLE)
During 2008 much work took place on the overhead line equipment with replacement supports being positioned along the line although not brought into use they stand ready for the new wiring.
Ordinary passenger train; breakdown or overhead line equipment train not going to clear the line (2Z99); Officers' special train (2Z01)
This involved signalling works and alterations to the tracks and overhead line equipment between Farringdon and City Thameslink to allow the merged services to operate.
Supertram is powered through 12 electric substations and fed through 1.07 cm diameter overhead line equipment (OHLE) wire.
Between 1994 and 1996, Göschwitz station was rebuilt when the Saal Railway was electrified and overhead line equipment was installed for the second time.
According to Network Rail, the main problems have been track-circuit failures, broken rails, track faults, points failures and overhead line equipment (OLE) failures.
Hawker Siddeley Switchgear is a British manufacturer of electrical switchgear and overhead line equipment, the company operates a wholly owned subsidiary in Australia.
New 750 v DC overhead line equipment was also erected, using masts designed by Balfour Beatty for the Tuen Mun Light Rail in Hong Kong.
The locomotive was used to prepare the ground for the 25kV AC electrification being installed on the West Coast Main Line, including the testing of overhead line equipment and staff training.
It is also where trains change power supply from overhead line equipment (OHLE) to 3rd Rail or from 3rd rail to OHLE depending on direction of travel.
The overhead line equipment on this section was designed to be easily convertible to 25kV AC electrification, which by now had been accepted as the standard overhead electrification system for BR.
More than half the catenary went dark, or nearly so.
Anything that needs to be done to the catenary before we get inside?"
This sign is most commonly seen at the end of the catenary.
The track has since been replaced, but the catenary is still missing.
When she could see again, the catenary was once more sizzling with its normal light.
David Gregory wrote a treatise on the catenary in 1697.
In 2001 the line was electrified but the trains never used the catenary.
Vehicles were also built to test catenary for high-speed operations.
In this case, the optimal curve will necessarily be a catenary.
A fabric structure acts as a catenary in two directions.
In 2005 current to the catenary was switched off.
In this period, the line received new catenary and many stations were renovated.
He also demonstrated that a catenary was not a parabola.
For a period of subjective time, the ship and its riders can be said to move along the catenary.
In electrified track, the old catenary may need to be replaced.
Most of the construction for the overhead catenary (wire) system was done in 1929 and 1930.
Let P 1 be the top of the catenary, on vertical line number 1.
The catenary drifted up against the boundary of the circle, touched it.
In one swift motion the catenary popped back out through the circle.
An equilibrium problem (not kinematic) of this type is the catenary.
The catenary is the only plane curve other than a horizontal line with this property.
When a catenary of steel a mile long is hung in the clear over a river, believe me, God knows.
Saash sat up then and looked over at the catenary.
The weight of the long catenary snatched the end out of his grasp.
The trains use overhead catenary for power supply and are broad gauge.
The overhead wiring of the line, mostly dating from 1935, was renewed between 2004 and 2006.
Work to upgrade the track and remove the overhead wiring began in August 2010.
These are diesel only lines with no overhead wiring.
It's probably been burning up ever since the overhead wiring got ripped out."
The overhead wiring was replaced, with new trolley poles where necessary.
Overhead wiring was commissioned in 1920 as part of the suburban electrification project.
They utilize overhead wiring first used by the streetcars.
It stated that the whole system was in very bad condition, with the track and overhead wiring needing replacement.
In 1899 550V overhead wiring was installed and the conduit removed.
Future developments includes the use of inductive charging under the street, to avoid overhead wiring.
The introduction of the new cars meant that some alterations had to be made to the overhead wiring and support poles.
In 1902, the electrification with overhead wiring had been completed, except for very few lines on the periphery.
From May 1911, overhead wiring was introduced.
A dwarf signal and overhead wiring stanchions remain in the paper mill grounds themselves.
The height of overhead wiring can create hazards at level crossings, where it may be struck by road vehicles.
Strain insulators are typically used outdoors in overhead wiring.
It finished when extensive roadworks made alterations to the overhead wiring uneconomic.
The overhead wiring remains in service to provide electrical service for street lights and other units occupying the base.
Shortly before the station rebuild commenced, the overhead wiring used by the electric suburban trains was removed.
Since electrification generally predated double stacking, the overhead wiring was too low to accommodate it.
China runs double stack trains with overhead wiring, but does not allow two maximum height containers to be stacked.
However, India is building some freight-only corridors with the overhead wiring at 7.45 m above rail, which is high enough.
The overhead wiring was removed on 17 August 1953 and the line singled and worked as a siding from 21 March 1961.
Power is supplied by catenary-style overhead wiring at 1500 volts DC.
The overhead wiring had to be extended beyond the Bay Excursion Platform onto the pier itself.
El diccionario DIKI utiliza tecnología que almacena y accede a información en el dispositivo final de los Usuarios (en particular con el uso de cookies). Al entrar en el sitio web, aceptas la Política de privacidad y autorizas el almacenamiento y acceso a los datos por parte del sitio web. https://www.diki.es con el fin de mejorar la experiencia de navegación en nuestro sitio web y analizar el movimiento del mismo, así como mostrar contenidos promocionales y publicitarios personalizados.