Additional examples are adjusted to the entries in an automated way - we cannot guarantee that they are correct.
Maintain boiler with 5-10 lbs. pressure for three to four hours, periodically opening the scum valve, if fitted.
In districts where the feed water is unsuitable, blowdown valves ("scum valves"), either continuously working while the regulator is open or operated in conjunction with the boiler feed, are fitted.