At this point, the Jubilee Line Extension is scheduled to be completed in late fall.
This will be connected to the existing infrastructure built for the Jubilee Line Extension, at the mezzanine level.
The Jubilee Line Extension generated three times as much land value uplift as it cost to build.
The Jubilee Line Extension, as the eventual project became known, opened in three stages in 1999.
The station was one of the first designed for the Jubilee Line Extension.
In 1988, they proposed construction of a second rail line to Docklands, which ultimately became the Jubilee Line Extension.
It was opened on 20 November 1999 as part of the Jubilee Line Extension.
But the Jubilee Line Extension is more than just another civic infrastructure project.
This is why the Jubilee Line Extension comes as such a surprise.
With the opening of the Jubilee Line Extension, the opportunity was taken to introduce new trains, and today the line is worked by 1996 trains.
At this point, the Jubilee Line Extension is scheduled to be completed in late fall.
This will be connected to the existing infrastructure built for the Jubilee Line Extension, at the mezzanine level.
The Jubilee Line Extension generated three times as much land value uplift as it cost to build.
The Jubilee Line Extension, as the eventual project became known, opened in three stages in 1999.
The station was one of the first designed for the Jubilee Line Extension.
In 1988, they proposed construction of a second rail line to Docklands, which ultimately became the Jubilee Line Extension.
It was opened on 20 November 1999 as part of the Jubilee Line Extension.
But the Jubilee Line Extension is more than just another civic infrastructure project.
This is why the Jubilee Line Extension comes as such a surprise.
With the opening of the Jubilee Line Extension, the opportunity was taken to introduce new trains, and today the line is worked by 1996 trains.