The two power houses at Dargai and Malakand Khas will be supplemented by a third 81 MW facility that was recently constructed in Dargai.
The state government of West Bengal state has also refused permission to a proposed 6000 MW facility where six Russian reactors were to be built.
The Ivanpah Solar Power Facility is a 370 MW facility under construction which will consist of three separate solar thermal power plants.
Construction of the 0.7MW facility began in March 2004.
Construction of a 15 MW hydroelectric facility at Kompienga was finished in 1989.
For making PV modules Reliance Solar has a 30 MW facility, the unit can make modules of ratings up to 250 Watts.
The Government of West Bengal refused permission to a proposed 6000 MW facility near the town of Haripur that intended to host 6 Russian reactors.
Designed by George F. Hardy Company, the construction of this 349 MW facility began in 1930 and became fully operational in 1936.
A 49.9 MW facility is planned near The Wilds, in southeastern Ohio.
The typical storage capacity of a 50 MW facility is 7 hours at nominal power.