The first segment of the expansion opened in October 2007 and added an additional three stations to the line.
"And these are the objects required to supply additional stations."
Their automation was increased and a number of additional stations were closed.
However, local advocates continued to push for an additional station in Orange.
Three additional stations are planned for, and may be built in the future.
There were plans for up to 100 additional stations at that point.
With an additional station, more studio space was needed.
In June 2008, the show expanded to include additional stations.
Another proposal considered was to build an additional station in the existing building.
Five additional stations on the red line are expected to be ready at the end of October.