The deck was not large enough to allow aircraft to land.
Once the program is complete, it will allow the current 36 aircraft to operate until 2027.
The orientation will however allow aircraft to take off and land even with heavy wind from east or west.
It was built to allow aircraft after landing to go into a tunnel under the mountain.
These are designed in part to allow larger aircraft to utilize the airport.
Inside the military zone, the roads have eight lanes to allow small aircraft to land.
This system allows the aircraft to operate within its design criteria.
The J65 with afterburner did not allow the aircraft to reach its design speed.
This control also allows the aircraft to back up on its own during taxiing.
Under no circumstances is this company going to allow your film crew on board that aircraft.