North of the county line, K-3 turns east and begins a concurrency with K-39.
After crossing the river the highway begins a concurrency with US 127.
It makes a 90-degree turn to the west to begin a concurrency with Pennsylvania Route 65.
US 50 curves southeast and begins a concurrency with I-71.
Just after the intersection is SR 309, which begins a concurrency through the city.
The highway travels south for eight miles before beginning a concurrency with ND 200.
At the north end of the town, the highway intersects SH-51 and begins a concurrency with it.
The two routes begin a concurrency to the northeast.
US 60 heads north, beginning a concurrency with the Interstate.
The three routes begin a concurrency to the north.