The bridge consists of two parallel structures, and the first one to be completed was the northern span in 1984.
The bridge consisted of three spans supported by two piers.
The bridge was 65 feet long and consists of four panels.
The bridge there consists of seventeen arches, but only one arch is currently used.
The bridge is 40 metres long and consists of seven stone arches.
In 1972, the bridge consisted of the piers and the cable.
The bridge consists of two lanes and has pedestrian walk-ways on either side.
The new bridge consists of 78 spans, each 35 m long.
The bridge consists of two parallel structures, both completed in 2003 by Primorje.
The bridge consists of the following: (from north to south)