The school was built in 2006 at a cost of £36 million.
The building was built in 1934 at a cost of $200,000.
The project was built at a cost of P58.7 million.
Line 2 was built at a cost of €450 million.
A new addition was built in 1968 at a cost of $3.5 million.
The light was built in 1896 at a cost of $25,000.
The building was built at a cost of £300 million and is home to around 3,000 staff.
The light was built in 1838 at a cost of $4,500.
He was built in 1992 at a cost of $450,000.
The school was built at a cost of $247,430 and opened in 1951.