Rosenborg had originally planned to build additional commercial facilities and a tower hotel during the 2002 construction, but this was canceled.
Further destruction took place when parts of the estate grounds were built over during the construction of the Ruabon bypass.
This apart from upgrading works, to add additional centre pillars, is the original structure built during the construction of the line.
The ghost station was partially built during the construction of the tunnel between 1971 and 1980, but has never been taken into use.
A modern concrete bridge was built during the construction of the N2 in the early 1970s.
The spire was not built at the time due to the lack of funds during the construction of the cathedral and its numerous renovations.
The lock was built during the construction of the Driffield Navigation between 1767 and 1770.
This is one of four such pillars built during the construction of the Haweswater aqueduct.
The basins are typically built during the construction of new land development projects including residential subdivisions or shopping centers.
This radio studio was built during the construction of the building and would broadcast regularly.