In 2005 it began a slow transition to eight carriage trains.
In 2013, the platform was extended, so that 10 carriage trains can stop at the station.
Woombye's platform has been extended to accommodate 6 carriage trains.
At one point seven carriage trains were trialled by combining a three- and a four-car set.
In 1955 the platforms were extended to take ten carriage trains.
Respectively 42 and 38 eight carriage trains are assigned to them.
In 1992 the platforms were lengthened to accommodate twelve carriage trains.
The initial rolling stock were 77 carriages intended to form 11 seven carriage trains.
Although 6 carriage trains will begin to operate in September 2012.
In 1955 both platforms were lengthened to accommodate ten carriage trains.