There is a power house, close to the concrete dam.
Also on the property is a concrete dam, built about 1909.
Instead work began on a single, much larger concrete dam higher up the valley.
The concrete dam was built in 1906 and has an approximately 2-story drop.
River diversion and work on the concrete dams began in early 2004.
At that time, it was designed as a concrete gravity dam.
A park has been developed here, with a small concrete dam to hold the river in place, allowing for swimming.
In 1922 a concrete dam was built to replace the original wooden one.
The site was selected because of the granite in the area that could support a large concrete dam.
The concrete dam is 8.2 metres high and was completed in 1995.