The dirt road is where the current runway lays.
A new apron, is planned south of the current runway.
A second runway running parallel to the west of the current runway will also be built.
Between 1960-62, the base was reconstructed and the current runway built.
The current runway is to be resurfaced as well.
The company plans to extend the current runway at Mundra to 4500 meters.
The current runway and terminal were built in 2003.
The current runway and terminal were built in the 1960s.
The current runway will be significantly improved in 2013.
The current runway is paved, 5,900 feet long and 150 feet wide.