The enemy had disappeared, but the damage she had caused required a new fight.
This damage is fatal to the engine and typically requires a full rebuild.
As it is, the damage is extensive and will require major repairs.
Nevertheless the damage to her skull required more time to heal.
However, neglect and damage to the park required it to be renovated.
The damage required several months of extensive repairs, resulting in an almost complete rebuild by May 1936.
Two elderly residents were evacuated, and the damage required the house to be demolished.
The damage sustained by the bridge required its partial closure for repairs.
Such damage can cause the male to dismount and may require weeks to heal.
Later damages required partial reconstruction, but the structure still has a resemblance to its original form.