It was not the design ultimately chosen by the American industry.
After several months of testing, the final design was chosen and production began.
The winning design will be chosen by the end of this year.
From those plans, three designs will be chosen early next year.
The plan was eventually abandoned with the current design chosen instead.
The design was chosen to allow for future line expansion.
Richard Lane's design was chosen at a cost of £265 17s.
When Ball's design was finally chosen, the commission insisted on certain changes.
His design was chosen for the Bowl, and he worked as the project architect.
This design was chosen because of the political instability in Europe at the time, which later led to the second world war.