The facility is connected to the downtown Houston tunnel system.
In November 1862 the school and its facilities became connected with Church of the Epiphany.
Whatever its purpose, the facility may have been connected to the tunnels, but its size dictated that it had to be a separate operation.
The facility was connected to the main building via a skywalk accessible from the second floor hallway.
The two facilities are connected to each other by an underground tunnel.
The facility is connected to the North American power grid via numerous 230,000 and 500,000-volt transmission lines.
These facilities are all connected by tunnels and skyways allowing students to use one locker-room facility.
All the facilities are connected by pathways, mostly unpaved but smooth and clean.
These facilities were all connected by a network of single path support roads.
The facility is connected to the Giant Forest by shuttle bus.