The 1st floor holds a multi-room conference center for up to 360 people.
The second floor held the offices of important depot members.
The main floor holds the kitchen and two dining rooms.
The second floor will hold three galleries, a conference room and offices.
The fourth floor held the main clinic and was two stories high.
The middle floor holds the picture collection, the heart of the operation.
The fourth floor holds the business, general sciences, and technology items.
Its five floors held every department for the existing business.
But the floor held - at least for the time being, it held.
The top floor held bulk items and was also used a storage area.