Although 850,000 people were hired for public works projects last year, this program is now being dismantled following recent rains.
About 15,000 people were evacuated following heavy rains from the outer bands of the storm.
Heavy flooding occurred along parts of the river in March 1926 following heavy rains.
The town was flooded in 1932 following torrential rains in the area.
Following heavy rains, the 2003 race was switched to the dirt track.
On July 13, 1972, the village was partly destroyed by landslides following heavy rains, with the loss of 32 lives.
Following heavy rains they may be closed to traffic.
The area was flooded following heavy rains in 1929.
Parking space is limited and roads may be difficult immediately following rains or snowmelt.
The landslide was the result of land erosion following heavy rains.