The three completed buildings, started less than two years ago, are fully leased.
The first building, with 567,318 square feet, is fully leased.
That building was fully leased by the time it came out of the ground.
"The mall has been fully leased the last eight of those years."
He added that the building was now almost fully leased, with only around 1,700 square feet of space still available.
He said that all six buildings are now fully leased.
At the time we expected to be fully leased in 24 to 30 months.
Two buildings are fully leased, with three more to open in 2005.
By 1982, with interest rates at about 20 percent, it was not fully leased.
"We expect to be fully leased in less than 15 months."