TranzMetro also announced that a third larger shelter will be installed on the site of the original station building.
At various times portable classrooms had been installed on the site.
The following spring, more families decided to move to the location and took up residence in additional trailers that were installed on the site.
By July 2009, service pipes and a permanent messing facility had been installed on the site.
Ten plunge columns were installed on the site for the main access ramp.
It was installed on the site in 1946 and has been in continuous operation since then.
It also constructs aspects of the design in its own shop and installs them on the site.
An electric pump was the last to be installed on the site, in 1937.
All the information will be stored in the Met Office computers installed on the site.
In 1933, the corporation decided to install a representative zoological collection on the site.