The crew left and Nyk began installing the first piece of Floran equipment, a power converter.
Install the second piece, called the sill, on the floor directly beneath the plate.
Over 60 individuals and institutions contributed the $95,000 to install the piece.
Completed in 1981, the art league installed the piece in front of its building on east Sixty-seventh Street.
To install the last piece after coping it, remove the scrap piece.
According to his contract, Mr. Haacke should have already installed the piece.
Test-fit and attach each strip by the same process used to install the first piece of stripping.
Use it as a pattern for fashioning a replacement, and then install the new piece.
Here lines are employed to create a wall drawing that is different each time the instructions are interpreted by those installing the piece.
After attaching the skids, install the other piece the same way as for the bottom of the basic box.