The first station was built in 1893, with an original capacity of 225 kW.
The two engines each have a capacity of 144 kW.
This gave the station a total generating capacity of 970 kW.
The power plant was completed and began operations in 1964, with a capacity of 150,000 kW.
This gave the station a generating capacity of 10,000 kW.
This gave the station an initial generating capacity of 150 kW.
These early turbines were small by today's standards, with capacities of 20-30 kW each.
The test device had a capacity of 5 kW.
The station had a generating capacity of 160,500 kW.
Each of these reactors has a capacity of 700,000 kW.