A 4,800 km (3,000 mile) network of transmission lines was necessary to bring generated power to consumers in southern Quebec.
It was recommended that a 75 km network of busway corridors to complement the existing heavy rail network would suit best.
DVB operate twelve routes on a 200 km network.
The Transport Authority operates twelve lines on a 200 km network.
The study was based on state media footage showing tunnel entrances, and estimated a 4 800 km (3 000 mile) network.
Work quickly expanded to meet the original plans for a four-line 62 km network.
They proposed a 645 km network along the valleys, avoiding any Alpine crossings, all of which was eventually built.
The project combines a high-bandwidth, high-capacity 50,000 km network with a growing range of services for users.
For this reason, the community has developed an 8.5 km network of forest lanes that is accessible to trucks.
The condition of this 885 km network, was such that a large capital investment was required to bring it up to a satisfactory standard.