The launch successfully placed the satellite into geostationary orbit.
The launch successfully placed the satellite into geosynchronous transfer orbit.
The launch successfully placed the satellite into Medium Earth orbit.
The launch successfully placed the satellite into a molniya orbit.
The launch successfully placed both satellites into a geosynchronous transfer orbit.
The launch successfully placed SES-1 into a subsynchronous orbit close to geostationary altitude.
The third launch placed 2 unclassified satellites in Earth orbit.
After a third launch on 23 August 2000 placed a mass simulator into a lower than planned orbit, the program was abandoned.
The launch successfully placed the satellite into low earth orbit.
The launch was unsuccessful and placed the satellite into low Earth orbit rather than the intended molniya orbit.