The railroad track followed generally the line of the present canal.
Further south, at Denstone, several buildings including a church have been built on the line of the canal.
The new structure is on the line of the original canal.
The main line of the canal was thus completed in 1816.
The main line of the canal is now being restored.
The line of the canal has been protected from development since 1992.
She looked out the kitchen window, at the dark line of the canal.
Pewsham Way now follows the line of the old canal.
The main line of the canal was completed in 1814, and opened on the 9 August.
Despite this, the railway when built did not run on the line of the old canal.