The company were asked to build a single flying example and a structure for static load testing.
Because they are transient in nature, they may be missed on routine viral load testing.
Two complete airframes were built for static and repeated load testing.
The first airframe was completed in October 1926 and used for static load testing.
Measuring a website's availability and reliability under various amounts of traffic is often referred to as load testing.
The results of static load testing can be:
Viral load testing measures the amount of HIV in your blood.
By the end of the year, the factory had only managed to complete a single airframe for static load testing.
"There are several ways of looking at load testing," he noted.
There is little agreement on what the specific goals of load testing are.