The new towers should be up in five or six years, he said.
Several years later, a new and higher tower was built on the same place.
Industry also left the area and new towers began to be built.
These new towers, however, were never put to the test.
The new tower was 90 feet high, much larger than the old church.
The new tower is expected to be completed before the end of 2011.
The new medical tower opened on August 25, 2009, at a final cost of $85 million.
A new tower was built in 1421, possibly after a fire.
Home Savings will take the entire first floor of the new tower.
A new tower, 65 feet tall, was built on top of the church in 1774.