The town moved to a site west of the reservoir.
He took his hands away from the side of the reservoir.
The floor of the reservoir is at around 196 feet.
Work on the construction of the reservoir began in 1871.
It had been found near the edge of the reservoir.
The filling of the reservoir is expected to begin in 2011.
The elevation of the reservoir is about 750 above the see level.
The water level of the reservoir has been brought down to 10.46 ft to take up the project.
Today this site is under the waters of the reservoir.
The design life of the reservoir is anticipated to be around 75-100 years.