The old shorter runway is now only used as a parallel taxiway.
In the coming years, the airport plans on providing a parallel taxiway to the full length of runway.
To build a new terminal complex and parallel taxiway which connects to the runway.
An older 2750 m runway is now a parallel taxiway.
The airfield was built with a parallel taxiway and ample ramp space.
It will also be equipped with a parallel taxiway along the runway.
Currently, it has a 5 million passenger capacity with parallel taxiway under construction.
It is a large airfield with parallel taxiway and tarmac space.
It has a parallel taxiway for most of the length of the runway.
At the same time the parallel taxiway to Runway 16-34 was extended.