The next phase of the testing called for determination of climb rates.
Equipment installation was virtually complete, and the next phase called for a live test of the launch systems.
The first phase, called the opens test makes sure each of the intended connections is good.
The second phase, called the shorts test makes sure there are no unintended connections.
The first phase called for seating to be constructed in the "lower portion" near the stage.
The first phase calls for 40 toilets and 80 kiosks, with a final total of 800 structures.
A second phase calls for the nonprofit groups to handle the construction and the interim management.
The practical phase of the program calls on them to teach some adults to read and write.
One phase of the plan focused on education and called for a reorganization of the system.
A second phase calls for the addition of trees, landscaping and benches in the commercial district.