All the platforms were connected together at their southern ends.
In addition, the two main platforms were connected by a subway.
The two platforms are connected by an old, metal, bridge.
The two platforms are connected by a concrete over bridge.
The subway connecting the two platforms was added in 1887.
The production plant is set out as a series of platforms connected by lifts.
The bridge connecting the two platforms was removed in 1999.
The platform is connected to the station building by an overpass.
This disused platform is still connected to the main line.
The station building and the platform are connected by a footbridge.