Autobahn A 31 can be reached 8 km from the community.
The speed can reach 180 km per hour that is why it's important to have an excellent ability to manage the car.
In the long term vision network length will reach 1890 km by 2030.
By the 1950s, the length of the tram lines reached 130 km.
The country would reach 200,000 km paved in 2000.
It is planned that the supply will reach 4.6 km by 2010.
The first two to reach 2 km were through to the sky wall round.
They can reach 1500 km and last for months.
About once a year (when reaching 480,000 km), the Inspektionsstufe 3 takes place, at three times eight hours each.
With special shells, it would be able to reach 60 to 80 km.