She received temporary repairs although the full extent of the damage to her bottom were not fully realized for several more months.
The ship returned to port at Barcelona to receive repairs.
It was listed in 1998 after having received a new slate roof and other repairs.
Her hull and various items of equipment received repairs over the next two months.
During the next two months, she received permanent repairs and conducted drills along the California coast.
In 1786 it was in poor condition and received major repairs.
Arriving there two days later, she received much needed repairs and replenishment.
St. Giles' church building received only minor repairs during the 17th and 18th centuries.
As such, this locomotive became the last to receive classified repairs.
Over the next three weeks, she received repairs of the damage to her bow.