The entire roof of the church was removed and replaced in 1976.
The roof over the cargo section was removed to make a short pickup type bed.
The roof has since been removed as part of the rebuilding in the late 1990s.
In March 2011 the roof of the station was removed and rebuilt at a greater height.
At the new ground another main stand was damaged; the roof being removed in a gale.
The roof of the hotel was removed in early November 2011.
Its original roof and gables were removed after a 1973 fire.
In 1925 the roof was removed to avoid taxes, and the building has deteriorated since.
For an extra dose of motivation, the roof was removed.
In 1929, the peaked roof was removed for an additional floor.