Since 1997, the primary section has been converted to a whole-day school.
However, this section of line was not converted to standard gauge until 1948.
The last sections of 6,250 V were converted during the 1980s.
Between 1937 and 1939, the upper section was converted to double track.
The section of line around the town was converted to use as a road bypass on the A382 road, opening in 1987.
In 1975, unfinished sections of the basement level were converted into meeting rooms.
These sections were converted into 4-lane, divided freeways between the 1970s and 1990s.
A section of the convent was converted into a music school.
Now some section of the palace is being converted into a hotel.
The main section of the hospital has now been converted into residential flats.