A large section of the comprehensive was burned to the ground in 1991 and rebuilt a year later.
The damaged section of the school was rebuilt and reopened on 12 December 1992.
The top section of the wall was then rebuilt using reinforced concrete.
That section of the bridge was rebuilt as a steel span.
This section of the school was rebuilt in 1994 and the science labs were also remodeled at the same time.
Stefan announced that the section was being rebuilt with new laser technology.
After the end of the war the destroyed section was rebuilt.
Constructions are planned to begin in 2010, old sections would be rebuilt.
This section of road was rebuilt in 6 months.
The last section destroyed in the War, between bridges 2 and 3, was not rebuilt until 1976.