Platform 1 is situated on the main line and is used by most trains.
The station is situated on the red line.
Although this was situated on the main line, it was only ever used by trains to Delph.
A number of level crossings are situated on the line between Barking and Grays.
It has a small railway station situated on the main line to Birmingham, although only a few services actually stop there.
It is situated on the main line to the Black Sea coast.
It will be situated before Adelfas on the same line.
Swan Village Station was situated on the line, next to the works.
The line's car shed and workshop are both situated on the line between the two Capolago stops.
The station is situated on the North-South coastal line.