In December 1961, the major construction phase was concluded and system testing was in full swing.
Users can access an unlimited number of instruments for charts, system testing, and explorations.
Although the year of the film production is unknown, it references 21 December in relation to the system testing at Metheringham.
The documents for system testing are prepared in this phase.
The company has in-depth experience with system testing and simulation.
During system testing before the official launch, they played 50,000 songs in a row with no commercials or DJ breaks.
After going off air for a short time, they did some final system testing before the launch by playing a loop of old television show theme songs.
In the case of problems encountered during system testing, the procedure to be followed varies according to the source of the error.
Long term costs can be minimized through careful system testing and thorough documentation.
Although system testing and acceptance testing are different phases they do have a lot of things in common.