At the same time the station's tracks were rebuilt.
Now the track is totally rebuilt with some configuration changes.
The track was rebuilt after it was damaged in 1998 by severe storms.
She said 15 minutes should be pared off that time within three years as tracks are rebuilt.
The track currently is being rebuilt with the 1/2-mile now paved.
Between 1949 to 1951, the second track was rebuilt.
The track was rebuilt and expanded several times during the years leading up to the Olympics.
The tracks to the east of the station were rebuilt in 1997-1998 to clear the way for the Federation Square project.
The original track was largely rebuilt in 1920 because of a fire.
The track has since been rebuilt into an advanced test track.